PROJECT – Iona Presentation College

Remedial Waterproofing Works
Perth, Western Australia

CLIENT 

Iona Presentation College – Maintenance Department

BUSS PROJECT MANAGER

Amaury Desjardins

DESCRIPTION

BUSS carried out the excavation work to remove the existing plants and damp soil against the wall where water was seeping through to the building. BUSS applied a new surface coating to the wall for a smoother finish to facilitate better binding of the double layer waterproofing membrane.

The Allduro waterproofing membrane system was installed with a supplier backed warranty of 20 years. To simplify key work, BUSS coordinated multiple subcontractors to execute the scope including the plumbing for a new rain pipe system and the excavation. In addition to the torch applied membrane system, BUSS installed a new drainage cell system to efficiently move stormwater away from the building.

PRODUCT USED

  • Allduro SopraGum 4C
  • Allduro SopraGum 3.0 S
  • Pressure Seal

HIGHLIGHTS

  • Safe and successful excavation
  • Two-layer system membrane application
  • Project completed on time