BP Service Station Kewdale
Concrete Repair
Bayside Australia

Description
As part of their ongoing maintenance strategy, BP initiated remedial works to be completed on the damaged concrete areas of their Service Station and Heavy Haulage Facility. In conjunction with Bayside Australia, BUSS was engaged to inspect the site and develop a methodology to complete repairs to the concrete areas that displayed cracking; consistent with heavy loads. BUSS executed the repairs to multiple expanses of the high traffic flow area using cementitious and epoxy repair mortars and installed stainless steel reinforcing.

Figure 1: Damaged sump – prior to repair

Figure 2: Sump – post repair
PROJECT INFO
PROJECT MANAGER:
Marc Cugini
PRODUCT USED:
ARDEX WPM 1000: a versatile rubber membrane best suited for waterproofing works.
- Parchem Nitomortar 903
- Parchem HB40
POINTS OF INTEREST:
- Works completed without incident and with zero
disruption to the service stations operations - BUSS personnel completed the BP Work Place
Clearance Group (WPCG) training prior to site
mobilisation - Effective Traffic Management Plan in high traffic
flow area(s). - Cracked and damaged concrete repaired with high
strength reinforced epoxy repair mortar.
LOCATION
549 Abernethy Road, Kewdale, WA
GET A QUOTE