HBF Stadium

Concrete Repairs and Remediation Works

Venues West
100 Stephenson Avenue, Claremont

1. Stairway after

Description

HBF Stadium, Mount Claremont, is a 30-year-old premier sporting complex and events venue. In mid-2019, VenuesWest engaged BUSS to complete concrete repair & remediation works to areas of the Southern Entry of the structure. The work scope was completed in the following three stages:

Stage 1: suspended slab concourse & stairs to the north western section – delamination survey, intrusive testing, surface preparation & repairs to surface cracks, removal, repair & resealing of control joints, application of a waterproofing system & non-slip contrasting nosing strip to stair treads.

Stage 2: suspended slab concourse at north eastern section – delamination survey, intrusive testing, surface preparation & repairs to surface cracks, removal, repair and resealing of control joints, application of a waterproofing system & non-slip contrasting nosing strip to stair treads. Eastern ramped entry slab and stairs, walls & balustrading – treatment to exposed reinforcement of blockwork walls, grout injection & crack repairs to retaining walls & the supply & installation of new powder coated metal balustrade & Colourbond flashing.

Stage 3: ramped entry slab, stairs, walls & balustrading to the south western area – delamination survey, intrusive testing, surface preparation & repairs to surface cracks, removal, repair & resealing of control joints, application of waterproofing system & non-slip contrasting nosing strip to stair treads, treatment to reinforcement of blockwork walls, grout injection & crack repairs to retaining walls, supply & install new powder coated metal balustrade and Colorbond flashing.

1. stairway before
1. Stairway after
Figure 1: Stairway – before and after
2. Door 1 entrance before
2. Door 1 entrance after
Figure 2: Door 1 Entrance – before and after

PROJECT INFO

PROJECT MANAGER:

Graham Murphy

POINTS OF INTEREST:
      • Works program allowed for scheduled events and continuous public access for the duration
      • Additional works awarded including supply & installation of removable bollards, replacement of garden beds with exposed aggregare concrete, blockwork repairs, removal & replacement of roadside curbing & walkway bitumen.