PROJECT – RCR Water Corporation, Swanbourne

Crack Injection

CLIENT 

Monford Group

BUSS PROJECT MANAGER

Amaury Desjardins

DESCRIPTION

BUSS was contracted to undertake specialist crack repairs for a new build water treatment tank. The project included surveying all crack locations and remediating with low viscosity epoxy crack injection resin. Careful consideration and planning were required when drilling holes in the right direction and at the optimal position along the crack, to avoid pressure collapses and large-scale concrete failure. Once completed, the entire tank was inspected, passing all safety and structural requirements to the satisfaction of the Water Corporation Team. 

PRODUCTS USED

  • Tampur 150

HIGHLIGHTS

  • All work completed by BUSS was accomplished at very short notice, within time constraints and on budget.