The THAC indoor pool at HBF stadium is a 50m pool built to cater for high-performance use. The pool regularly welcomes national and international guests for training, competitive and recreational swimming. The elite facilities are used extensively all year round.
In late June 2021, BUSS Group was successfully awarded the tender to complete repairs works and re-grouting of the pool. The remediation works comprised the following scope:
• Protection and support of the movable starting block bulkhead;
• Preparation and cleaning of pool and movable bulkhead surfaces;
• Re-grouting of pool and edge tiles, central return water diffusers and hydrostatic valves;
• Replacement of a nominated quantity of edge and pool tiles;
• Replacement of the construction and movement joints underneath water level; and
• Supply and install the replacement hydrostatic valves and diffuser cover.